Future Train Station — The town is working with the state to reestablish passenger rail service and provide for economic development in Hillsborough. It will use 20 acres that the town owns by the North Carolina Railroad corridor. See the Future Train Station project page.
Lawndale Basin Sewer Rehabilitation — Sewer lines will be repaired and relined in the Lawndale Basin in northern Hillsborough. See the Lawndale Basin Sewer Rehabilitation project page.
Parking Study— The town is comprehensively studying its parking supply and the demand for parking in the downtown area and West Hillsborough to address existing conditions and future needs. See the Parking Study page.
Highway 86 North Facility — The facility will be renovated and storage outbuildings will be constructed to allow use by multiple town operations. See the Highway 86 North Facility project page.
Ridgewalk Greenway — A feasibility study has been conducted on a future north-south greenway that would provide a bike/pedestrian route from the future train station to the downtown. See the Ridgewalk Greenway project page.
River Pumping Station Relocation — The town is working to replace the 1970s-era River Pumping Station, moving it from the Eno River floodplain and increasing sewer capacity in the area. See the River Pumping Station Relocation project page.
South Churton Street Multimodal Corridor Study — South Churton Street is being studied to develop design concepts that contribute to the town's character and meet the goals of a state-funded project to widen the road from Interstate 40 to the Eno River. See the South Churton Street Multimodal Corridor Study project page.
Starfield Booster Pumping Station — The town is working to add a booster pump to improve the interconnection between the town's water supply and the Orange Water and Sewer Authority's supply in southern Orange County. See the Starfield Booster Pumping Station project page.
Unified Development Ordinance Rewrite — The town is updating its unified development ordinance to ensure it aligns with the Hillsborough Comprehensive Sustainability Plan. See the Unified Development Ordinance Rewrite project page.
Water and Sewer Facility Renovation and Expansion — The Adron F. Thompson Water/Sewer Facility will be renovated and expanded. See the Water and Sewer Facility Renovation and Expansion project page.